Govia Thameslink Railway launches consultation on December 2015 timetable

On Friday 7 November 2014, Govia Thameslink Railway (GTR) launched a 12 week consultation with passengers and stakeholders on the proposed off peak timetable which will be introduced in December 2015 to pave the way for the new expanded Thameslink network of 2018.

Details of the proposed changes can be found on www.southernrailway.com and on www.thameslinkrailway.com/about-us/news

You will be able to respond to the consultation either by e mail on gtr.timetableconsultation@gtrailway.com(from Friday 14 November 2014) or by post (details below).

If you require a hard copy of the document please contact:

GTR Dec 2015 Consultation
FREEPOST LON15973
Croydon
CR0 1ZY

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.