St Stephen’s Hill closed from Monday

Edited note from the county council

The resurfacing scheme will take place between 8pm and 5am, using a full road closure between the junctions with Watling Street and Griffiths Way. It is expected that it will be completed in five nights.

Signed alternative routes will be in place. Vehicle access to properties during the working hours will be maintained and controlled by gatemen at each end of the closure but access will only be allowed when it is safe to do so.

The contractor aims to complete the noisiest operations such as removing the old road and jack hammering by midnight to reduce the disturbance to nearby residential properties. 

The work is weather dependent and from time to time unforeseen circumstances can arise and work may continue outside the advertised hours.

Any changes to the proposed start date, duration or working hours will be announced on the information boards on site and will be available at www.hertsdirect.org/roadworks

Bus service routes may be affected by these works – for details of any changes you can visit www.intalink.org.uk – and look in the ‘service disruptions’ section.

General road faults like potholes or faulty streetlights can be reported at www.hertsdirect.org/highwayfaults

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.