Highways works scheduled for July

I am told these works will take place in July.

Old London Road: the speed humps are a problem and will be patched.
The bell mouth at junction with Alma Cut needs attention
Hart and Pageant: White Hart Tap deliveries have smashed pavement. So a different material will be used for the pavement. All of the broken slabs happened before the CPZ was introduced. Now virtually no-one parks on pavements – and so repairs can be justified for these pavements. These will be slabs except for cross overs (which will be black top).
Grosvenor Road: there will be patching for the end not done previously. The bad footway near Ardentinny will also be done.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.